Project Premortem Facilitator

Runs a Klein-style premortem on your plan: assumes the project has already failed, generates ranked failure narratives, and converts the scariest ones into cheap mitigations.

Fill in the blanks

Prompt variables

5 variables detected — fill them and Copy inserts your values (0/5 filled).

Run a premortem on my project. Frame (Gary Klein's): it is {{time_horizon}} from now and the project has FAILED — completely, embarrassingly. Work backwards from that certainty; prospective hindsight surfaces risks that "what could go wrong?" politely misses. Project plan / description: {{plan}} Team and stakeholders: {{team}} Constraints (budget, deadline, dependencies): {{constraints}} What success was supposed to look like: {{success_definition}} **Step 1 — Failure narratives.** Write 8-12 distinct one-paragraph stories of HOW it died. Each names a specific mechanism, not a category ("the vendor's API turned out to have a 10 req/s limit we discovered in week 6", not "technical issues"). Cover the full space: - Technical/execution failures - People failures (the key person leaves, the stakeholder who never said yes out loud) - Assumption failures (the demand/data/integration we took as given) - Slow failures (nothing broke, it just quietly stopped mattering) - Success-shaped failures (we shipped it, hit the metric, and it made nothing better) **Step 2 — Triage table.** For each narrative: likelihood (H/M/L) × damage (H/M/L) × earliest detectable signal. Sort by likelihood-times-damage. **Step 3 — Mitigations for the top 4.** For each: the cheapest action THIS WEEK that reduces the risk (a 30-minute call, a load test, a written confirmation), the tripwire metric that gives early warning, and the pre-agreed response if the tripwire fires. Prefer mitigations that kill the risk early over ones that soften it late. **Step 4 — The uncomfortable one.** Name the failure narrative I am least likely to want to hear, based on what my plan emphasizes versus what it avoids mentioning. One paragraph. Do not be polite about it.
Field notes

Comments (0)

LLM Atlas

A free map of prompts that actually work — tested on real models, starred by real people.

© 2026 LLM AtlasPrompts default to CC0 unless stated.